|
|
|
|
|
|
|
|
|
|
|
|
Beginning in the 1850s, manufactured gas plants (MGPs) were built in cities throughout Illinois. These plants produced gas by heating coal or oil. The gas was used for lighting, cooking and heating. The MGPs were closed as natural gas became widely available.
As the MGPs were closed, equipment was removed and buildings were razed. However, some byproducts - primarily coal tar - of the manufactured gas process remained buried on the site. While this was in accordance with the practices of the time, today the location of these byproducts must be located, identified and removed. Ameren Illinois conducts MGP site investigations and cleanups in accordance with the Illinois Environmental Protection Agency’s Voluntary Site Remediation Program.
The files found on this website are a collection of documents associated with the Champaign MGP Remediation Project. In addition to this website, site information repositories are maintained at the Douglass Branch of the Champaign Public Library, 504 E. Grove Street, and at the information desk of the Champaign City Building, 102 N. Neil Street.
For additional inquiries about this project, contact:
Leigh Morris
Ameren Illinois
200 W. Washington Street
Springfield IL 62701
E-mail: lmorris@ameren.com
For inquiries regarding the Illinois Environmental Protection Agency’s oversight of this project, contact:
Stan Black
Office of Community Relations
Illinois EPA
P.O. Box 19276
Springfield IL 62794-9276
Phone: 217.785.1427
E-mail: stan.blackj@illinois.gov
|
|
|
Ambient Air Monitoring WP 10-1-97 |
|
|
CSI Report |
|
|
Section 8 Signature |
|
|
Appendix A (NC): |
Champaign Sanborn Maps |
|
|
|
|
Appendix B: |
Part A-EDR Illinois Water Well Report |
|
|
|
|
|
Part B-EDR Radius Map |
|
|
|
|
Appendix C: |
Part A-1990 Soil Data |
|
|
|
|
|
Part B-1990 Soil Data |
|
|
|
|
|
Part C-1991 Soil Data |
|
|
|
|
|
Part D-1991 Soil Data |
|
|
|
|
|
Part E-1991 Soil Data |
|
|
|
|
|
Part F-1991 Soil Data |
|
|
|
|
|
Part G-1992 Surface Soil Data |
|
|
|
|
Appendix D: |
Phase II SI Logs |
|
|
|
|
Appendix E: |
Well Construction Details |
|
|
|
|
Appendix F: |
Part 1-GW 1990 |
|
|
|
|
|
Part 2-GW 1992 |
|
|
|
|
Appendix G: |
Geotech Data 8-9-05 |
|
|
|
|
Appendix H: |
Boring Logs 1996 |
|
|
|
|
Appendix I: |
CSI Logs 2004 |
|
|
|
|
Appendix J: |
1999 Elevations |
|
|
|
|
|
2000 Elevations |
|
|
|
|
|
2001 Elevations |
|
|
|
|
|
GW Elevation Data |
|
|
|
|
|
Well Survey 2004 |
|
|
|
|
Appendix K: |
CSI COC App. |
|
|
|
|
Appendix L: |
Part A-Soil 04070377R |
|
|
|
|
|
Part B-Soil 04070448R |
|
|
|
|
|
Part C-Soil 04070635R |
|
|
|
|
Appendix M: |
Groundwater Analytical 2005-2006 |
|
|
|
|
|
04070740 |
|
|
|
|
|
|
05030451 |
05030451DR |
05030451QC |
05030451SS |
|
|
|
05060318 |
05060318DR |
05060318QC |
05060318SS |
|
|
|
05090845 |
05120697 |
06030912 |
|
|
|
|
06060698 |
06060698DR |
06060698QC |
06060698SS |
|
|
|
06090621 |
06090621DR |
06090621QC |
06090621SS |
|
|
|
06120390 |
06120390DR |
06120390QC |
06120390SS |
|
|
Appendix N: |
Part A-04070535QC |
|
|
|
|
|
Part B-04070740QC |
|
|
|
|
Figures: |
Fig. 1-1 |
Fig. 1-2 |
|
|
|
|
|
Fig. 2-1 |
Fig. 2-2 |
Fig. 2-3 |
Fig. 2-4 |
|
|
|
Fig. 2-5 |
Fig. 2-6 |
Fig. 2-7 |
Fig. 2-8 |
|
|
|
Fig. 2-9 |
Fig. 2-10 |
Fig. 2-11 |
Fig. 2-12 |
|
|
|
Fig. 2-13 |
Fig. 2-14 |
Fig. 2-15 |
Fig. 2-16 |
|
|
|
Fig. 2-17 |
Fig. 2-18 |
Fig. 2-19 |
Fig. 2-20 |
|
|
|
Fig. 2-21 |
|
|
|
|
|
|
Fig. 3-1 |
|
|
|
|
|
|
Fig. 4-1 |
Fig. 4-2 |
Fig. 4-3 |
Fig. 4-4 |
|
|
|
Fig. 6-1 |
Fig. 6-2 |
Fig. 6-3 |
Fig. 6-4 |
|
|
|
Fig. 6-5 |
Fig. 6-6 |
Fig. 6-7 |
Fig. 6-8 |
|
|
|
Fig. 6-9 |
Fig. 6-10 |
Fig. 6-11 |
|
|
|
|
Fig. 7-1 |
Fig. 7-2 |
Fig. 7-3 |
Fig. 7-4 |
|
|
|
Fig. 7-5 |
Fig. 7-6 |
Fig. 7-7 |
Fig. 7-8 |
|
|
|
Fig. 7-9 |
Fig. 7-10 |
|
|
|
|
|
Fig. ES-1 |
|
|
|
|
|
Tables: |
Tab. 2-1 |
Tab. 2-2 |
Tab. 2-3 |
Tab. 2-4 |
|
|
|
Tab. 2-5 |
Tab. 2-6 |
Tab. 2-7 |
Tab. 2-8 |
|
|
|
Tab. 2-9 |
Tab. 2-10 |
Tab. 2-10A |
Tab. 2-10B |
|
|
|
Tab. 3-1 |
Tab. 3-2 |
|
|
|
|
|
Tab. 4-1 |
Tab. 4-2 |
|
|
|
|
|
Tab. 5-1 |
Tab. 5-2 |
Tab. 5-3 |
Tab. 5-4 |
|
|
|
Tab. 5-5 |
Tab. 5-6 |
Tab. 5-7 |
Tab. 5-8 |
|
|
|
Tab. 5-9 |
Tab. 5-10 |
Tab. 5-11 |
Tab. 5-12 |
|
|
|
Tab. 5-13 |
Tab. 5-14 |
Tab. 5-15 |
Tab. 5-16 |
|
|
|
Tab. 5-17 |
Tab. 5-18 |
Tab. 5-19 |
Tab. 5-20 |
|
|
|
Tab. 5-21 |
|
|
|
|
|
|
Tab. 6-1 |
Tab. 6-2 |
Tab. 6-3 |
Tab. 6-4 |
|
|
|
Tab. ES-1 |
|
|
|
|
|
Complete IRM Work Plan 10-1-97 |
|
|
Complete Off-Site Work Plan 2-14-08 |
|
|
Complete Off-Site Work Plan 3-13-08 |
|
|
Complete Supplemental Site Investigation 7-30-97 |
|
|
IEPA Response to Submittal of IRM Work Plan 10-24-97 |
|
|
PSC Response to IEPA Comments IRM WP 11-4-97 |
|
|
IEPA Response to Submittal of IRM Work Plan 11-5-97 |
|
|
IEPA Approval of IRM Work Plan & Air Monitoring WP 2-6-98 |
|
|
IEPA Comments on Off-Site Investigation Work Plan 3-5-08 |
|
|
Ameren Response to IEPA Off-Site Comments 3-14-08 |
|
|
IEPA Approval of Off-Site Work Plan 3-25-08 |
|
|
Draft Offsite SIR Report |
|
|
IEPA Comments for Off-Site Investigation Report |
|
|
IEPA August 2008 Fact Sheet and Open House Announcement |
|
|
Appendix A: |
Hydraulic Conductivity Data Sheets |
|
|
Appendix B: |
Groundwater Sampling Field Data Sheets |
|
|
Appendix C: |
Well Construction and Development Logs |
|
|
Appendix D: |
Soil Analytical Data |
|
|
|
08040184 |
08040185 |
08040186 |
08040187 |
|
|
|
08040238 |
08040412 |
08040620 |
08050396 |
|
|
|
08050415 |
08050439 |
08050440 |
08050896 |
|
|
|
08060976 |
|
|
|
|
|
Appendix E: |
Groundwater Analytical Data |
|
|
|
Groundwater May 2008 |
Groundwater July 2008 |
|
|
|
Waste Water 1 |
Waste Water 2 |
|
|
Appendix F: |
Soil Boring Logs |
|
|
Appendix G: |
Physical Testing Laboratory Data |
|
|
Figures: |
Fig. 1-1 |
Fig. 1-2 |
Fig. 2-1 |
Fig. 2-2 |
|
|
|
Fig. 2-3 |
Fig. 2-4 |
Fig. 2-5 |
Fig. 2-6 |
|
|
|
Fig.2-7 |
Fig. 2-8 |
Fig. 2-9 |
Fig. 2-10 |
|
|
|
Fig. 2-11 |
Fig. 3-1 |
Fig. 6-1 |
Fig. 6-2 |
|
|
|
Fig. 6-3 |
Fig. 6-4 |
Fig. 6-5 |
|
|
|
Tables: |
Tab. ES-1 |
Tab. 2-1 |
Tab. 2-2 |
Tab. 2-3 |
|
|
|
Tab. 3-1 |
Tab. 3-2 |
Tab. 4-1 |
Tab. 5-1 |
|
|
|
Tab. 5-2 |
Tab. 5-3 |
Tab. 5-4 |
Tab. 5-5 |
|
|
|
Tab. 5-6 |
Tab. 5-7 |
Tab. 5-8 |
Tab. 5-9 |
|
|
|
Tab. 5-10 |
Tab. 5-11 |
Tab. 6-1 |
Tab. 6-2 |
|
|
|
Tab. 6-3 |
|
|
|
|
|
Final Offsite SIR Report |
|
|
Appendix A: |
Hydraulic Conductivity Data Sheets |
|
|
Appendix B: |
Groundwater Sampling Field Data Sheets |
|
|
Appendix C: |
Well Construction and Development Logs |
|
|
Appendix D: |
Soil Analytical Data |
|
|
|
08040184 |
08040185 |
08040186 |
08040187 |
|
|
|
08040238 |
08040412 |
08040620 |
08050396 |
|
|
|
08050415 |
08050439 |
08050440 |
08050896 |
|
|
|
08060976 |
|
|
|
|
|
Appendix E: |
Groundwater Analytical Data |
|
|
|
Groundwater May 2008 |
Groundwater July 2008 |
|
|
|
Waste Water 1 |
Waste Water 2 |
|
|
Appendix F: |
B-800 |
B-801 |
B-802 |
B-803 |
|
|
|
B-804 |
B-805 |
B-806 |
B-807 |
|
|
|
B-809 |
B-811 |
B-812 |
B-813 |
|
|
|
B-814 |
B-815 |
B-816 |
B-817 |
|
|
|
B-818 |
B-819 |
B-820 |
B-821 |
|
|
|
B-822 |
B-823 |
B-824 |
B-825 |
|
|
|
B-826 |
B-827 |
B-828 |
B-829 |
|
|
|
B-830 |
B-831 |
B-832 |
B-833 |
|
|
|
B-834 |
B-835 |
B-836 |
B-837 |
|
|
|
B-838 |
B-839 |
B-840 |
B-841 |
|
|
|
B-843 |
B-844 |
B-845 |
B-846 |
|
|
|
B-847 |
B-848 |
B-849 |
B-850 |
|
|
|
B-851 |
B-852 |
|
|
|
|
Appendix G: |
Physical Testing Laboratory Data |
|
|
Figures: |
Fig. 1-1 |
Fig. 1-2 |
Fig. 2-1 |
Fig. 2-2 |
|
|
|
Fig. 2-3 |
Fig. 2-4 |
Fig. 2-5 |
Fig. 2-6 |
|
|
|
Fig.2-7 |
Fig. 2-8 |
Fig. 2-9 |
Fig. 2-10 |
|
|
|
Fig. 3-1 |
Fig. 6-1 |
Fig. 6-2 |
Fig. 6-3 |
|
|
|
Fig. 6-4 |
Fig. 6-5 |
|
|
|
|
Tables: |
Tab. ES-1 |
Tab. 2-1 |
Tab. 2-2 |
Tab. 2-3 |
|
|
|
Tab. 3-1 |
Tab. 3-2 |
Tab. 4-1 |
Tab. 5-1 |
|
|
|
Tab. 5-2 |
Tab. 5-3 |
Tab. 5-4 |
Tab. 5-5 |
|
|
|
Tab. 5-6 |
Tab. 5-7 |
Tab. 5-8 |
Tab. 5-9 |
|
|
|
Tab. 5-10 |
Tab. 5-11 |
Tab. 6-1 |
Tab. 6-2 |
|
|
|
Tab. 6-3 |
|
|
|
|
|
|
|
Evaluation of Soil Gas Data collected at residential properties near former MGP site, Champaign, Illinois |
|
|
|
|
IEPA Concurrence with Evaluation of Soil Gas Data |
|
|
|
|
Remedial Objectives Report, former manufactured gas plant, Champaign, Illinois; dated 12/5/2008 |
|
|
Figures |
Figure 1-1 |
Figure 1-2 |
Figure 2-1 |
Figure2-2 |
|
|
|
Figure 2-3 |
Figure 3-1 |
Figure 3-2 |
Figure3-3 |
|
|
|
Figure 3-4 |
Figure 3-5 |
Figure 4-1 |
|
|
|
Tables |
Table 3-1 |
Table 3-2 |
Table 3-3 |
Table 3-4 |
|
|
|
Table 3-5 |
Table 3-6 |
Table 3-7 |
Table 3-8 |
|
|
|
Table 3-9 |
Table 3-10 |
Table 3-11 |
Table 3-12 |
|
|
|
Table 3-13 |
Table 3-14 |
Table 3-15 |
Table 3-16 |
|
|
|
Table 3-17 |
Table 3-18 |
Table 3-19 |
Table 3-20 |
|
|
|
Table 3-21 |
Table 7-1 |
Table ES-1 |
|
|
|
Remedial Action Plan, former manufactured gas plant, Champaign, Illinois; dated 12/2008 |
|
|
Figures |
Figure 1-1 |
Figure 1-2 |
Figure 1-3 |
Figure 2-1 |
|
|
|
Figure 2-2 |
Figure 2-3 |
Figure 2-4 |
Figure 2-5 |
|
|
|
Figure 3-1 |
Figure 3-2 |
Figure 3-3 |
Figure ES-1 |
|
|
|
Figure ES-2 |
Figure ES-3 |
|
|
|
|
Tables |
Table 1-1 |
Table 2-1 |
Table ES-1 |
Table ES-2 |
|
|
|
|
IEPA Comments on Remedial Objectives Report and Remedial Action Plan |
|
|
|
|
Ameren Responses to IEPA comments on ROR and RAP |
|
|
|
|
IEPA Final Approval of On-Site Remedial Objectives Report and Remedial Action Plan |
|
|
|
|
Ambient air monitoring plan, dated 6/12/09 |
|
|
Complete File |
|
|
|
|
|
|
Table of Contents |
|
|
|
|
|
List of Tables |
|
|
|
|
|
|
List of Figures |
|
|
|
|
|
|
Plan |
|
|
|
|
|
|
Appendix A |
Wind Speed |
|
|
|
|
Appendix B |
Air Monitoring Field Log |
|
|
|
|
Appendix C |
Air Quality |
|
|
|
|
Educational Stormwater Permit Inspection Report |
|
|
February 19, 2010 Soil Data Review for New Monitoring Wells
IEPA review of February 19, 2010 Soil Data Review for New Monitoring Wells |
|
|
May 2010 First Quarter Groundwater Monitoring Report |
|
|
Second and Third Quarter 2010 Groundwater Report
|
|
|
IEPA Approval Letter |
|
|
Champaign First Quarter 2011 Groundwater Report |
|
|
IEPA Approval |
|
|
Remedial Action Plan Addendum
|
| |
Signed RAP Addendum
|
| |
2011 Addendum - Open Air Dig Table
|
| |
2011 Addendum - Figure 1
|
|
|
IEPA Approval of Remedial Action Plan Addendum
|
|
|
Champaign MGP 2nd Quarter 2011 Groundwater Monitoring Report |
|
|
Champaign MGP 3rd Quarter 2011 Groundwater Monitoring Report |
|
|
January 23, 2012 Well Installation Proposal |
|
|
IEPA Approval of January 23, 2012 Well Installation Proposal |
|
|
MGP 4th Quarter 2011 Groundwater Monitoring Report |
|
|
IEPA Approval of 4th Quarter 2011 Groundwater Monitoring Report |