Processing Fee List (Non-refundable) 
 
Boat Dock Permits    Fee
  • New Permit for one-slip dock
  $150 plus $25 for each additional slip
  • Permit Modification
    (includes addition of one slip)
  $75 plus $25 for each additional slip
  • Certified dock builder application
 

$300

  • Certified dock builder annual
  $100
  • Certified dock builder reinstatement
  $300
 
Bank Stabilization Permits
  • Seawall
  $300 for first 100 feet plus $1/foot over 100 feet
  • Vegetation or riprap (vegetation planting or rock placement to prevent bank erosion)
  $100
  • Dredging-excavation permit
  $300
  • Boat Launching Ramp permit
  $300
  • Pre-2008 Deck permit*
  $100
  • Permit extension
  $25
  • Permit transfers (All permitted facilities may be transferred with one application and fee)
  $35
  • Other permits (i.e., water intakes, utility facilities)
  $50
  • Pre-2008 Patio permit*
  $100
  • Pre-2008 Gazebo permit*
  $100
  • Stand-alone breakwater
  $500 for first 100 feet plus $1/foot over 100 feet
  • Pre-2008 Concrete Walkway permit
  $100
 
*Post-2008 decks, patios, gazebos and walkways are prohibited.
boat dock permits, bank stabilization permits, processing fees, dock permits
 
 
Follow Us