Taum Sauk photos 
Upper reservoir filled - 2010 
Ameren Missouri’s pumped-storage Taum Sauk Pumped-Storage Hydroelectric plant is at full generating capacity and ready to meet the power needs of Ameren Missouri customers during times of peak demand.
 
The photos below show the new upper reservoir, which was built using more than three million cubic yards of roller-compacted concrete and more than three million man-hours of labor from over 1,000 workers.

Click on a thumbnail to view or download photo.
         
Click to view or download photo   Click to view or download photo   
         
 Click to view or download photo    Click to view or download photo    
         
taum sauk pictures, taum sauk photos, taum sauk aerials, aerials, taum sauk pumped-storage hydroelectric plant, taum sauk hydroelectric plant, hydroelectric plant, pumped-storage plant, Ameren Missouri
 
 
Follow Us