Millcreek Battery Energy Storage System
Ameren Missouri is proposing a battery energy storage system (BESS) project in Lincoln County, Missouri, to help meet growing demand and support reliable electric service. The Millcreek Energy Center has the potential to include a solar project, which is still under evaluation. Both projects are subject to regulatory review and will include community engagement before construction begins.
About the Millcreek Energy Center Battery Storage Project

Ameren Missouri filed an application with the Missouri Public Service Commission (PSC) in May 2026 seeking approval to construct a BESS facility at the Millcreek site.

Battery storage facilities store electricity and deliver it back to the grid when it is needed most, including during extreme weather. These systems respond almost instantaneously and help support reliable service when conditions change. As part of a broad mix of generation and storage resources, batteries are one of the ways we are working to deliver the energy our customers need while keeping bills as low as possible.

The proposed facility would be located on Ameren Missouri-owned property west of Highway 61 and just south of Tickridge Road. The battery equipment is expected to occupy approximately 12 acres, with an additional 12 acres for substation and switching equipment. More than 200 acres are expected to remain largely undeveloped, providing natural terrain and forested areas to help screen the facility and maintain separation from neighboring land uses. Additional information about battery storage technology, safety, environmental considerations and project development is available on our Battery Storage Information page.

With timely PSC approval, the project will be ready to serve customers in 2028.


 

Proposed Location

Map and site layout of the proposed Millcreek battery storage project showing the location west of Highway 61 and south of Tickridge Road. The diagram identifies the battery storage area and the proposed substation and switching equipment, with the battery storage area depicted southwest of the substation and switching equipment.

Community Benefits

Reliability

Support electric service as energy needs continue to grow

Revenue

Generate local tax benefits

Jobs

Create construction and long term operations opportunities
Project Schedule
May 2026 Late 2026 2027 Mid-2028
Application filed with Missouri PSC Anticipated PSC approval Start of construction In service

The project schedule will be updated as major milestones are met. The schedule is subject to change.

Download the Battery Storage Development Information Sheet (PDF) for additional details.

Download the Battery Storage Project Information Sheet (PDF) presented at the July 2026 local public hearings held by the Missouri Public Service Commission.

Potential Solar Project
Ameren Missouri is evaluating a potential solar project at the Millcreek site. The solar project is in the early stages of development, and site studies are underway. Details about the project’s size and layout will be shared as they come into focus. While the exact timeline is still being determined, if the project moves forward, Ameren Missouri aims to begin producing energy for the community before 2030.